 |
|
 |
 |
|
 |
 |
market exploit |
|
customer mquiry |
|
full communicating with customer |
|
mould technology requirement sheet  |
|
| |
 |
 |
roducts audit |
|
mould scheme decision |
|
mould price estimate |
 |
confirm tool delivery-date |
|
fill in¡¶mould quotation sheet¡· |
|
|
|
|
| |
 |
 |
recheck and signature the ¡¶mould quotation sheet¡·  |
|
|
| |
 |
 |
quote |
|
communicate with customer |
|
confirm the request of quotation  |
|
|
| |
 |
 |
sign contract |
|
charge deposit |
|
make¡¶manufacturing plan¡·  |
|
|
| |
 |
 |
manufacturing plan design schedual |
|
time assembling  |
|
|
| |
 |
|
production analysis |
|
amending mold flow analysis |
|
3D dividing the mould |
|
2D drawing design  |
|
|
| |
 |
 |
E-mail to customer |
|
communication again untilOK |
 |
forder material  |
|
|
|
|
| |
 |
 |
CNC Programm moulding assemble |
|
make parts card  |
|
|
| |
 |
 |
moulding parts drawings and card to get order material |
|
make in different workshop finish  |
|
|
| |
 |
 |
in-comping inspection |
|
cheek manufacture plan |
 |
parts in spetion |
|
parts in stores  |
|
|
| |
 |
 |
record divide and protection |
|
advice of shipment  |
|
|
| |
 |
 |
the trial assembling mould |
|
Fit mould |
|
self-cheek mould  |
|
|
| |
 |
 |
finish mould inspection |
|
following the first shot |
|
sample inspection  |
|
|
| |
 |
 |
packing and sending sample |
|
communicate |
|
the comments from customer  |
|
|
| |
 |
 |
schedual the modifying mould |
|
audit the engineer documents |
|
store all the files  |
|
|
| |
 |
 |
modify the mould until satisfied  |
|
|
|
| |
 |
 |
middle term/final term following |
|
join in outcheck before shipment |
|
contact with customer and serve after-sales |
|
|
| |